GRID TELEMETRY
33,710 MW
Total Monitored Power
27,514 MW (81.6%)
Transmission Bottleneck Queue
5,192 MW
Surplus Green Corridors
74 Sites
Severe Moratorium / Quota Freeze

Grid Bottleneck Status

Critical Moratorium (Dublin, AMS, Slough, FFM)
High Transmission Waitlist (Paris, Milan, Madrid)
Medium (Flexible / Conditional Allocations)
Low / Surplus Green Corridor (NO4, SE1, Aragón)
TSO Official Capacity Moratorium Zones

European Campus Radar

0 sites