Data centre construction glossary
The vocabulary of Europe's data centre buildout, in plain English.
- IT load (MW)
- The electrical capacity available to computing equipment, the industry's
standard measure of a facility's size. A "100MW campus" means 100MW for servers, not the total
site draw. DC Spotter tracks projects of 15MW IT load and above.
- Hyperscale
- Facilities built for a single very large operator (cloud or AI), typically
tens to hundreds of MW, often self-built or built-to-suit by developers.
- Colocation
- A facility whose operator rents space and power to many customers.
The traditional backbone of European markets like Frankfurt, London and Amsterdam.
- Campus
- A multi-building site under one master plan, phased over years. Campus
announcements usually cite the end-state capacity, not what gets built first.
- FLAP-D
- Frankfurt, London, Amsterdam, Paris, Dublin: Europe's five established
data centre hubs. Power scarcity in FLAP-D is pushing growth to secondary markets.
- Grid connection / TSO queue
- The agreement (and waiting list) to draw power from the
transmission network. In constrained markets this is the scarcest asset a project can hold, and
connection queues are public in several countries.
- Substation
- The switching and transformer station linking a site to the grid. A new
or upgraded substation application is one of the strongest early signals of a serious project.
- EIA / VIA / UVP
- Environmental impact assessment: the statutory review large projects
undergo. Italy's VIA and Germany's UVP registers publish filings that often reveal projects
months before any press coverage.
- Outline vs full planning
- UK-style two-step consent: outline settles the principle of
development; full (or "reserved matters") settles the detail. Big campuses often go outline first.
- SPV (special purpose vehicle)
- A company created to hold one project or site, often
with an anonymous name. Land bought by a three-week-old SPV is how big operators move quietly.
- Fit-out
- Installing the electrical and cooling systems and IT space inside a completed
shell, typically the most expensive phase per square metre.
- PUE (power usage effectiveness)
- Total facility power divided by IT power. Modern
European builds target 1.2 or below; regulators increasingly ask for it in planning documents.
- RFS (ready for service)
- The date a facility can accept customer equipment,
the milestone that actually matters in delivery schedules.
- Heat reuse
- Exporting waste heat to district heating networks, increasingly a planning
condition in Germany and the Nordics.
- Powered land
- A site sold with grid capacity already secured, the premium product of
the current land market.