Methodology and sources.

The sources behind the tracker, how evidence is labelled, and how to request a correction.

Public sources only

DC Spotter researches European data centre projects through public records, company disclosures and reporting. The public beta presents a dated project snapshot. Source links make the underlying documents accessible; verification is shown at field level rather than assumed for an entire record.

Editorial boundaries

A source attached to a project may support one milestone without establishing its capacity, contractor or delivery date. The record's evidence labels show that distinction.

Evidence and estimates Est.

Recorded facts, reported figures and editorial estimates serve different purposes:

Stages follow public milestones

The tracker distinguishes Rumoured, Land secured, Planning submitted, Planning approved, Grid secured, Under construction, Fit-out and Live, with separate states for refused or paused projects. These are recorded milestones rather than a guaranteed sequence. A filing is not an approval, planning consent is not construction, and a proposed grid connection is not energisation. Read the stage alongside its source and evidence label.

Corrections and removals

For an inaccurate or outdated record, write to [email protected] with the project name, the field concerned and supporting source. We assess corrections against the public evidence and reflect accepted updates in the tracker. Recorded project changes can be explored in the changelog.